亚洲中文字幕伊人久久无码_国产69精品久久久久99尤物_国产午夜亚洲精品国产成人小说_无码任你躁久久久久久老妇_999久久久国产精品_欧美精品亚洲精品日韩专区VA_亚洲色偷偷综合亚洲AV伊人_国产精品9999久久久久蜜桃

激光粒度儀的調試前的需要檢查五點(diǎn)

來(lái)源:

作者:


 激光粒度儀使用時(shí)也要進(jìn)行特定的安裝調試,那么我們如何正確的對粒度儀進(jìn)行正確的調試呢?還有就是在調試時(shí)要注意那些問(wèn)題呢?在正式開(kāi)始使用激光粒度儀,我們需要做好激光粒度儀的調試前的檢查工作。具體工作內容如下:

The use of laser particle sizer are subject to the specific installation and debugging, then how can we correct the sizer correct debugging? There is in commissioning should pay attention to those problems? In the official start using laser particle sizer, we need to do a good job of laser particle sizer commissioning before the inspection work. Specific work is as follows:

  1、新安裝的設備,在設備就位時(shí),難免會(huì )殘留鐵塊、焊條頭、焊渣等異物。在不開(kāi)主電機的情況下,打開(kāi)進(jìn)料口下面的除雜擋板,讓雜質(zhì)和洗倉物料從此處排出;

1, the new equipment installed in the equipment in place, will foreign body iron, welding head and welding slag etc.. When the main motor is not opened, the impurity removing plate is opened under the feed port, so that impurities and washing materials are discharged from this place;

 

  2、當我們前期檢查一切正常后,通電啟動(dòng)設備。檢查所有電機的旋轉方向;

2, when we check all previous normal, electrify start device. Check the direction of rotation of all motors;

 

  3、檢查電磁閥噴吹是否正常吸合有力,調節除塵器電磁閥脈寬和噴吹間隔時(shí)間;

3, check whether the solenoid valve jet is normal, pull strong, adjust the dust collector solenoid valve pulse width and jet interval time;

 

  4、檢查剎克龍下面關(guān)風(fēng)器是否有漏風(fēng)現象,可以用手或細粉料放在接口處有無(wú)往里吸的感覺(jué),如有必須進(jìn)行密封處理。上述檢查一切正常后,準備帶料生產(chǎn);

4, check the cyclone wind closing device if there is leakage phenomenon, can use hand or fine powder on the interface without feeling smoke inside, if must be sealed. The above inspection is normal, ready to take material production;

 

  5、對激光粒度儀www.rongyoujixie.com的喂料電機和分級輪電機兩個(gè)變頻器進(jìn)行參數檢查設定,檢查電機所對應的空開(kāi)、接觸器、熱繼電器、過(guò)電流繼電器調整是否合適,將一次線(xiàn)全部重新鎖緊一遍。

5 frequency converter of laser particle sizer www.rongyoujixie.com feeding motor and grading wheel motor parameters corresponding to check the settings, check the motor circuit breaker, contactor, thermal relay, overcurrent relay adjustment is appropriate, will be the first line to lock again.